Micro-GASS Start-up Instructions
Start-up Procedure
Once all sample, purge, and electrical connections have been made the
system is ready for operation. Start with the sample flow meter closed
and system and pump power switches in the off position.
- Turn on the system power switch on the front panel. This
supplies power to the heated line, the filter and dryer heaters and
the temperature controller. Allow 10-15 seconds for the system to
come fully on-line.
- The temperature controller will
display the dryer temperature.
- Adjust the dryer set-point
temperature to 35° C, or ten Celsius degrees above the maximum
anticipated dew point temperature, whichever is higher.
Click here for the temperature controller instructions.
- Switch on the Pump Power. To
prevent wet sample gas from entering the unheated dryer the sample
pump is powered via the temperature controller. A relay in the
temperature controller remains open until the system reaches 40° C.
The system requires 10-15 minutes before the operating temperature
is reached; and the pump then becomes energized. There will be a
temperature spike associated with the start of sample flow. This is
acceptable provided the temperature stabilizes within a few minutes.
- Open the flow meter, adjust the
flow to the desired rate (0.5 to 1 lpm). Lower flows result in dryer
gas samples. Samples with a dew point of greater than 35° C should
be run at not more than 0.5 lpm.
Shutdown Procedure
Do not permit wet gases to condense in the Nafion dryer. Follow this
procedure to purge wet sample gas from the system before shutting down.
- With system and pump power
switches in the ON position remove the filter cap from the
bottom of the enclosure. (Check the condition of the filter
element.)
- Allow the pump to run for at
least two minutes.
- Turn the power switches to the
OFF position and replace the filter cap.
|